Nortec MES2 User Manual Page 40

  • Download
  • Add to my manuals
  • Print
  • Page
    / 54
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 39
37 | Maintenance and Servicing
MES2 Maintenance Checklist
Model #: _________________
Serial #: _________________ Tag: ________
Cylinder #:
CHECK CYLINDER
Cylinder spent), yellow LED flashing 4 times in sequence.
(If Yellow LED is On and cylinder is not new then cylinder will have to be replaced soon.)
REPLACE CYLINDER
Cylinder drained.
Disconnect open, On/Off/Drain switch off, water shut off valve closed, cover removed.
Cylinder removed
Drain valve removed / cleaned / new O-Ring installed
Drain valve cleaned / installed / ground wire attached.
New Cylinder Installed New cylinder model #
(Should be same as removed cylinder)
Cylinder plug colors match cylinder dots.
Cylinder plugs snug and in good condition.
High Water Sensor plug snug and in good condition.
Steam hose attached.
Cover replaced, water shut off valve open, On/Off /Drain switch On, Disconnect Closed
SYSTEM CHECK
Yellow Led flashing? No Yes Flash Sequence?
(See Troubleshooting Chapter for actions if yellow LED is flashing)
Primary power disconnect turned off
Cylinder plugs snug and in good condition.
Electrical wiring not loose and in good condition,
Steam hoses and steam lines in good condition / No kinks in hose,
No Signs of water leaking around humidifier, steam line, condensate returns,
Cover replaced, water shut off valve open, On/Off /Drain switch On, Disconnect Closed
Inspected by: Date of inspection: _______/_______/______
Company:
Page view 39
1 2 ... 35 36 37 38 39 40 41 42 43 44 45 ... 53 54

Comments to this Manuals

No comments