Nortec MES2 User Manual Page 5

  • Download
  • Add to my manuals
  • Print
  • Page
    / 54
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 4
Introduction | 2
Receiving and Unpacking
1 Check packing slip to ensure ALL material has been delivered.
2 All material shortages are to be reported to Nortec within 48 hours from receipt of goods.
Nortec assumes no responsibility for any material shortages beyond this period.
3 Inspect shipping boxes for damage and note damages on shipping waybill accordingly.
4 After unpacking, inspect equipment for damage and if damage is found, notify the shipper
promptly.
5 All Nortec products are shipped on an FOB factory basis. Any and all damage, breakage or
loss claims are to be made directly to the shipping company.
Before Installation
1 Ensure that available voltage and phase corresponds with humidifier voltage and phase as
indicated on humidifier’s specification label.
2 Ensure that the dedicated fused disconnect provided for the humidifier is of sufficient size to
handle the rated amps as indicated on the specification label.
3 Ensure sufficient clearances will be available as described in “Location” on page 13.
4 Ensure steam lines can be routed to distributor as described in Steam Lines and
Condensate Returns on page 16.
Figure 1: Specification Label Location
Page view 4
1 2 3 4 5 6 7 8 9 10 ... 53 54

Comments to this Manuals

No comments